Project Planning Processes and Public Building Project Delivery in South-West Nigeria: Evidence from A Cross-Sectional Survey

Repeated cost overruns, delays and quality concerns in public buildings highlight the importance of effective project planning in South-West Nigeria. This study examined the association between project planning processes and public building project delivery. Using a cross-sectional survey of building professionals across six states, 402 questionnaires were administered from a population of 480, 305 were returned (75.9%), and 300 were included in the analysis (74.6% of those distributed). Descriptive statistics, multiple regression and seemingly unrelated regression (SUR) were employed. The mean overall planning score was 4.200 (SD = 0.720); procurement planning had the highest mean (M = 4.324), while risk management had the lowest (M = 3.957). The overall-delivery regression was significant, F(8, 291) = 32.564, p < .001, R² = .473, with significant positive coefficients for resource planning (b = 0.206, p = .001), scheduling (b = 0.132, p = .006) and procurement planning (b = 0.195, p = .001). The SUR Wald χ² statistics were 214.68 for cost, 286.41 for time and 267.53 for quality (all p < .001). Planning practices were jointly associated with perceived delivery across all three outcomes, although the pattern of individual associations differed by model. Integrated planning, with particular emphasis on resource availability, realistic scheduling and procurement readiness, is recommended to strengthen public building project delivery.

Keywords: project planning; scheduling; resource planning; procurement; cost and time performance; public buildings; South-West Nigeria.